TABLE OF CONTENTS

 

 

1.         INTRODUCTION

Background of the Project

Project Scope and Programme

Purpose of the Manual

Project Organisation

 

2          Noise

Introduction

Noise Parameters

Monitoring Requirement and Equipment

Monitoring Locations for Construction Noise

Baseline Monitoring for Construction Noise

Impact Monitoring for Construction Noise

Event and Action Plan

Construction Noise Mitigation Measures

Operational Traffic Noise Monitoring

 

3          Air quality

Introduction

Monitoring Parameters

Monitoring Requirement

Monitoring Equipment

Monitoring Locations

Baseline Monitoring

Impact Monitoring

Air Quality Performance Limits

Event and Action Plan

Mitigation Measures

 

4          WAter quality

Introduction

Construction Site Audits

Site Inspection

Compliance Audits

Mitigation Measures

 

5.         waste management

Introduction

Mitigation Measures

 

6          Landscape and visual

Introduction

Audit Requirement

Mitigation Measures

 

7          ENVIRONMENTAL AUDITING

Introduction

Compliance with Legal and Contractual Requirements

Environmental Complaints

 

8          REPORTING

General

Baseline Monitoring Report

Monthly EM&A Reports

Final EM&A Review Report

Data Keeping

Interim Notifications of Environmental Quality Limit Exceedances

 

 

List of Tables

 

Table 2.1        Noise Monitoring Stations during Construciton Phase

Table 2.2        Action and Limit Levels for Construction Noise

Table 2.3        Event/Action Plan for Construction Noise

Table 2.4        Noise Monitoring Stations during Operation Phase

Table 3.1        Proposed Air Quality Monitoring Stations

Table 3.2        Action/Limit Levels for Air Quality

Table 3.3        Event and Action Plan for Construction Air Quality

 

 

List of Figures

                                                                                                                                

NOL/ERL/300/C/WKT/ENS/M62/001             Proposed Road Works at West Kowloon

NOL/ERL/300/C/WKT/ENS/M62/002             Project Organization and Line of Communication

NOL/ERL/300/C/WKT/ENS/M62/003             Locations of Construction Noise Monitoring Stations

NOL/ERL/300/C/WKT/ENS/M62/004             Locations of Traffic Noise Monitoring Stations

NOL/ERL/300/C/WKT/ENS/M62/005             Locations of Construction Dust Monitoring Stations

NOL/ERL/300/C/WKT/ENS/M62/006             Environmental Complaint Flow Diagram

 

 

List of Appendices

 

Appendix A        Implementation Schedule of Recommended Mitigation Measures

Appendix B       Sample Data Sheet for Construction Noise Monitoring

Appendix C       Sample Data Sheet for Operational Traffic Noise Monitoring

Appendix D       Sample Data Sheet for Air Quality Monitoring

Appendix E       Sample Template for the Interim Notification of Exceedance